Placeholder & Co

Demo — Data cleanup & automation

StockRoom

A small manufacturer whose stock sheet says what was there last Tuesday. Reorder points, lead times and alerts are rules a spreadsheet can't enforce.

Everything here is editable and nothing is saved — it’s sample data in your browser. Click around, break things, reset.

Stock lines
8
Below reorder point
2
action needed
Run-out risk
1
won't survive the lead time

Reorder suggestions

Generated from reorder points, lead times and usage — the rules a shared spreadsheet holds in someone’s head.

  • ⚠ Order now12 × Primer, zinc (5L)(PR-M8) — 14-day lead
  • ▲ Order soon50 × Flat bar 10mm (6m)(FL-10) — 7-day lead, order by 27 Aug

Book stock in

Issue to a job

Try issuing more than is on hand.

Stock levels
SKUItemOn handReorder atCoverStatus
BX-40Box section 40×40 (6m)48304.0 wks✓ OK
FL-10Flat bar 10mm (6m)22252.4 wks▲ Below reorder
PR-M8Primer, zinc (5L)462.0 wks⚠ Order now
WD-70Welding wire 0.8mm (15kg)946.0 wks✓ OK
GL-12Galv. bolts M12 (box 100)1785.7 wks✓ OK
TB-25Tube 25mm (6m)63404.2 wks✓ OK
PT-BLTopcoat, black (5L)1156.1 wks✓ OK
DS-11Cutting discs 115mm (box 25)652.7 wks✓ OK

Weeks of cover by item

Colour marks state, not identity — amber is below reorder, red won’t survive its lead time. The table above carries the same status in words.

02468PR-M8FL-10DS-11BX-40TB-25GL-12WD-706.1PT-BL

Could this work for your business?

This demo was built from the same parts we use for real client apps. Tell us what your version would need to do and we’ll tell you what it would cost — usually within a day.